Our Projects

Expertise Reflected in Our Projects

Our Selected Works

A glimpse into diverse projects we proudly delivered.

Industrial Projects Completed
% 0
Metal Structures Executed
% 0
0 +

Projects Delivered

0

Years of Experience

1

Wastewater Treatment

Implementation of a wastewater treatment plant in Aleppo, Cordoba Hills

2

Works at Dam April 17

Convert the capacity tunnel in the 17th of April dam from a circular section to a rectangular section and the transition area in the diversion tunnel.

3

Implementation of metalworks

Implementation of metalworks at the Meydanki Dam and the Tishreen Dam

4

Cement mixers

Equipping cement mixers for most mixers in Qatar and abroad, silos (cement storage tanks), preparation tanks, conveyor belts

5

Equipping cement factory kilns

Other Projects

Other Projects

Lid
Links
Heat Exchangers
Cement silo
Transfer
A sedimentation tank for drinking water with multiple specifications, Macedonian specification (DA)
A special piece
A furnace connection with a thickness of 45 mm and a diameter of 4.40 m (for a cement factory)
A high-pressure gas tank with a capacity of 100 tons.
A storage tank with a capacity of 40 tons
Closing gates at the Al-Maskanah East pumping station (Japanese)
Scroll to Top